Completed Projects
PROJECT LOCATION | WORK SCOPE | YEAR | Main Contractor |
---|---|---|---|
MBS (Mice loading bay B4,Hotel tower 1 B1,EAF-PC-B3-01) | Internal Insulation for the supply duct, Butterfly valve change, replace EAF motor, Jacketing insulation | Nov 2018 | Yorkool Pte Ltd |
MBS (Mice Level-5,Mice Level-6,Mice Hall A near, Mice loading bay B4, AHU-RT-B2-01) | Actuator Valve, Flexible, Jacketing for CHWS/R, Internal Insulation for the supply duct, Blower Bearing | Nov 2018 | Yorkool Pte Ltd |
MBS (Mice Level- 6,Hotel Tower T3-B3 carpark, Retail B2-96, Mice Level-5, Hotel Tower 1 B1, EAF-PT-B4-14) | Repair Leakage on ChilledWater Pipe, Remove& Replace compressor for the PCU, Jacketing for CHWS/R,replace KEF Motor, Dismantle/install Butterfly valve | Nov 2018 | Yorkool Pte Ltd |
MBS (Retail B2-98, Mice Level-5, Hotel Tower 2 Level 13, MiceLevel-6, Retail Mice B1-90A/90B) | Jacketing insulation, Flexible, Jacketing insulation, Replace Motor At Mice Level 6,Jacketing insulation | Dec 2018 | Yorkool Pte Ltd |
MBS (Hotel Tower 3 Level 22, Casino Level 4, Hotel Tower 2 B1,Casino | Blower Bearing, Dismantle &Replace TEF Motor, Dismantle Bearing, Remove & Replace Fire Rated Flexible | Dec 2018 | Yorkool Pte Ltd |
MBS (Hotel Tower 2 Level 23, Hotel Tower 2 Level 55M, Mice Level 5, Mice Hall A to F, Mice Level 6, Retail BSK B1) | Dismantle & Replace Butterfly Valve, Dx Unit, Replace AHU motor, Replace Armaflex Insulation, Replace Fire Rated flexible, Replace Cassette Unit, Jacketing insulation | Jan 2019 | Yorkool Pte Ltd |
MBS (Supply Chain Room B4, Podium Theatre B3, Podium Theatre B3 Carpark) | Replacing Grills and Duct, New Fire Rated motor | Feb 2019 | Yorkool Pte Ltd |
MBS (Hotel Tower 3 B1, Hotel Tower 2 Level 23,Casino B4 Carpark, Hotel Tower 1 Level 15,16&17, Mice Hall E) | Replace Gate valve Through Freezing, Replace Motorised Valve, Install T-joint c/w endcap, Replace jacketing and Armaflex insulation | Mar 2019 | Yorkool Pte Ltd |
MBS (Mice Level-5,B1 Female Toilet,Retail Theatre lift lobby B2, Mice B2, Mice Hall A & B) | Replace AHU Motor, Replacement of Actuator And Strainer, Replacement of Actuator, Replace EAF at Link Chamber, Jacketing insulation | Mar 2019 | Yorkool Pte Ltd |
MBS Mice level 4, casino level 3 lion bridge, ASM-B1 Marketing Office) | Fire rated board installation works | Mar 2019 | Yorkool Pte Ltd |
NGEE Polytechnic,Tai Seng & DSTA | FCU installation & duct works | Mar 2019 | ACE M&E Service Pte Ltd |
MBS hotel tower 2 & retail | MV fan installation works | Apr 2019 | Yorkool Pte Ltd |
Balestier Hill Primary School | CHWP insulation & duct works | May 2019 | ACE M&E Service Pte Ltd |
Punjab grill restaurant | Annual FCU Service & repair works | Jun 2019 | Wrapster Food(s)Pte Ltd |
MBS | DUCT Repair works | Jun 2019- Aug 2019 | Yorkool Pte Ltd |
MBS | AHU Freezing work at tower 3 level 23 | Aug 2019 | Yorkool Pte Ltd |
Singapore Press Holding | FCU installation & duct works | Oct 2019 | Singapore Press Holding Toa payoh |
Alcotec Precision Engineering | FCU servicing & Repair Works | Nov 2019 | Alcotec Precision Engineering Pte Ltd |
JTC – Tukang innovation grove | Jacketing works for FCU -50’nos | Dec 2019 | HYY Engineering Pte Ltd |
MBS Tower 3 | PEU/PCU installation works | Dec 2019 | Yorkool Pte Ltd |
MBS Mice B4,Hotel T1 B1 | Replace fan motor & insulation work | Dec - Jan 2020 | Yorkool Pte Ltd |
MBS | Repair Works various part of MBS | Jan - Mar2020 | Yorkool Pte Ltd |
MBS | Repair Works various part of MBS | May - July 2020 | Yorkool Pte Ltd |
Assisi Hospice | Replacement of CHW fan coil unit | May 2020 | Assisi Hospice FM | MBS level 55 spago | Mv fan installation & duct works | Sep 2020 | Yorkool Pte Ltd | MBS mice b4 corridor | EC fan motor installation | Sep 2020 | Yorkool Pte Ltd |
Assisi Hospice | CWS pump overhaul | Sep 2020 | Assisi Hospice FM |
Ongoing Projects
PROJECT LOCATION | WORK SCOPE | YEAR | Main Contractor |
---|---|---|---|
PUB NBVLS | Ducting works & VRV installation works | Sep 2020 Ongoing | Electromech Technologies Pte LTD |
Marina Bay Sands | MV fan installation works | Sep 2020 | Yorkool Pte Ltd |
CKR Kaki Bukit Building | Aircon Service & Repair Contract | Nov 2020 Ongoing | CKR Group Of Companies |
Geylang 26A | HDB Electrical works | Nov 2020 Ongoing | JNL M&E Engineering Pte Ltd |
Tampines T-space | MEP works | Nov 2020 | Waykart Pte Ltd |
PUB Changi Water Reclamation Plant | SS Duct Works At MBR 2.1 & 4.1 Room liquid side | Jan 2021 Ongoing | Electromech Technologies Pte Ltd |
SA 72 | Repair & Redecoration Works | Jan 2021 Ongoing | OGSP Engineering Pte Ltd |
Suntec Convention Centre | ACMV Service & Repair Works | Jan 2021 Ongoing | Jardine Engineering (Singapore)Pte Ltd |