PROJECT LOCATION WORK SCOPE YEAR Main Contractor
Marina Bay Sands (Mice loading bay B4,Hotel tower 1 B1,EAF-PC-B3-01) Internal Insulation for the supply duct, Butterfly valvechange, replace EAF motor, Jacketing insulation Nov 2018 Yorkool pte ltd
Marina Bay Sands (Mice Level-5,Mice Level-6,Mice Hall A near, Mice loading bay B4, AHU-RT-B2-01) Actuator Valve, Flexible, Jacketing for CHWS/R, Internal Insulationfor the supply duct, Blower Bearing Nov 2018 Yorkool pte ltd
Marina Bay Sands (Mice Level- 6,Hotel Tower T3-B3 carpark, Retail B2-96, Mice Level-5, Hotel Tower 1 B1, EAF-PT-B4-14) Repair Leakage on ChilledWater Pipe, Remove& Replace compressor for the PCU, Jacketing for CHWS/R,replace KEF Motor, Dismantle/install Butterfly valve Nov 2018 Yorkool pte ltd
Marina Bay Sands (Retail B2-98, Mice Level-5, Hotel Tower 2 Level 13, MiceLevel-6, Retail Mice B1-90A/90B) Jacketing insulation, Flexible, Jacketing insulation, Replace Motor At Mice Level 6,Jacketing insulation Dec 2018 Yorkool pte ltd
Marina Bay Sands (Hotel Tower 3 Level 22, Casino Level 4, Hotel Tower 2 B1,Casino Blower Bearing, Dismantle &Replace TEF Motor, Dismantle Bearing, Remove & Replace Fire Rated Flexible Dec 2018 Yorkool pte ltd
Marina Bay Sands (Hotel Tower 2 Level 23, Hotel Tower 2 Level 55M, Mice Level 5, Mice Hall Ato F, Mice Level 6, Retail BSK B1) Dismantle & Replace Butterfly Valve, Remove & Replace Dx Unit, Replace AHU motor, Replace Armaflex Insulation, Replace Fire Rated flexible, Replace Cassette Unit, Jacketing insulation Jan 2019 Yorkool pte ltd
Marina Bay Sands (Outside Supply Chin Room B4, Podium Theatre B3, Podium Theatre B3 Carpark) Replacing Grills and Duct, Replace New Fire Rated motor Feb 2019 Yorkool pte ltd
Marina Bay Sands (Hotel Tower 3 B1, Hotel Tower 2 Level 23,Casino B4 Carpark, Hotel Tower 1 Level 15,16&17, Mice Hall E) Replace Gate valve Through Freezing, Replace Motorised Valve, Install T-joint c/w endcap, Replace jacketing and Armaflex insulation Mar 2019 Yorkool pte ltd
Marina Bay Sands (Mice Level-5,B1 Female Toilet,Retail Theatre lift lobby B2, Mice B2, Mice Hall A & B) Replace AHU Motor, Replacement of Actuator And Strainer, Replacement of Actuator, Replace EAF at Link Chamber, Jacketing insulation Mar 2019 Yorkool pte ltd
Marina Bay Sands (Retail Mice B1 & B2 ,Hotel Tower 3 B1, Mice Level 4, Retail shop B2-46 & B2-60, Mice Level 4, Casino Level 3 Lion Bridge, ASM-B1 Marketing Office) Replace Jacketing, Fix the Metal Ceiling Board, Fix the Fire rated Board And KEF Duct Mar 2019 Yorkool pte ltd
NGEE Polytechnic & BalestierSchool, Tai Seng & DSTA Dismantle Duct & Ceiling Cassette Unit, Install new Ceiling Cassette Unit Mar 2019 ACE M&E Service Pte Ltd
Marina Bay Sands (Hotel Tower 2 Level 9 Room 967, Mice B4 Hx Room Cyclone Pump, Theatre Level 4, Mice Level 3, Theatre AHU-T-4-01, Podium Theatre B3) Replace Gate Valve, Replacejacketing, Replace 22KW Motor Apr 2019 Yorkool pte ltd
Balestier Hill Primary School Jacketing insulation, Replace EAF Duct & FAF Duct Claim 1 May 2019 ACE M&E Service Pte Ltd
Punjab Grill Restaurant At Marina Bay Sands Annual Maintenance FCU Servicing Ongoing – Jun 2019 Wrapster Food (s) Pte Ltd
Marina Bay Sands Repair Works at various part of MBS Jun 2019- Aug 2019 Yorkool pte ltd
Marina Bay Sands Replace Butterfly valve at PAU at hotel tower 2 level 23 Aug 2019 Yorkool pte ltd
Singapore Press Holding Supply & install New FCU and modification of supply duct Oct 2019 Singapore press holding Toa payoh
Alcotec Precision Engineering FCU servicing Nov 2019 Alcotec Precision Engineering pte ltd
JTC – Tukang innovation grove Jacketing works for FCU -10’nos Dec 2019 Hyy engineering pte ltd
Marina bay sands Tower 3 PEU/PCU installation works Dec 2019 Yorkool pte ltd
Marina baysands Mice B4,Hotel T1 B1 Replace fan motor & fibre glass insulation work Dec To Jan 2020 Yorkool pte ltd
Marina bay sands Repair Works various part of MBS Jan To Mar2020 Yorkool pte ltd
Marina bay sands Repair Works various part of MBS May to July 2020 (ongoing) Yorkool pte ltd
Assisi Hospice Replacement of CHW fan coil unit May 2020 Assisi hospice FM
Pub Nbvls Ducting works & VRV installation works Sep 2020 Electromech technologies pte LTD
Marina Bay Sands MV fan installation and ducting works Aug to September 2020 ongoing Yorkool Pte LTD

Completed Projects

Project #1
Work Scope: Internal Insulation for the supply duct, Butterfly valve change, replace EAF motor, Jacketing insulation
Project Location : Marina Bay Sands (Mice loading bayB4, Hotel tower 1 B1,EAF-PC-B3-01)
Year of Completion: November 2018

Project #2
Work Scope: Actuator Valve, Flexible, Jacketing for CHWS/R, Internal Insulationfor the supply duct, Blower Bearing
Project Location : Marina Bay Sands (Mice Level-5,Mice Level-6,Mice Hall A near, Mice loading bay B4, AHU-RT-B2-01)
Year of Completion: November 2018

Project #3
Work Scope: Repair Leakage on ChilledWater Pipe, Remove& Replace compressor for the PCU, Jacketing for CHWS/R,replace KEF Motor, Dismantle/install Butterfly valve
Project Location : Marina Bay Sands (Mice Level- 6,Hotel Tower T3-B3 carpark, Retail B2-96, Mice Level-5, Hotel Tower 1 B1, EAF-PT-B4-14)
Year of Completion: November 2018

Project #4
Work Scope: Jacketing insulation, Flexible, Jacketing insulation, Replace Motor At Mice Level 6,Jacketing insulation
Project Location : Marina Bay Sands (Retail B2-98, Mice Level-5, Hotel Tower 2 Level 13, MiceLevel-6, Retail Mice B1-90A/90B)
Year of Completion: December 2018

Project #5
Work Scope: Blower Bearing, Dismantle &Replace TEF Motor, Dismantle Bearing, Remove & Replace Fire Rated Flexible
Project Location : Marina Bay Sands (Hotel Tower 3 Level 22, Casino Level 4, Hotel Tower 2 B1,Casino
Year of Completion: December 2018

Project #6
Work Scope: Dismantle & Replace Butterfly Valve, Remove & Replace Dx Unit, Replace AHU motor, Replace Armaflex Insulation, Replace Fire Rated flexible, Replace Cassette Unit, Jacketing insulation
Project Location :Marina Bay Sands (Hotel Tower 2 Level 23, Hotel Tower 2 Level 55M, Mice Level 5, Mice Hall Ato F, Mice Level 6, Retail BSK B1)
Year of Completion: January 2019

Project #7
Work Scope: Replacing Grills and Duct, Replace New Fire Rated motor
Project Location : Marina Bay Sands (Outside Supply Chin Room B4, Podium Theatre B3, Podium Theatre B3 Carpark)
Year of Completion: February 2019

Project #8
Work Scope: Replace Gate valve Through Freezing, Replace Motorised Valve, Install T-joint c/w endcap, Replace jacketing and Armaflex insulation
Project Location : Marina Bay Sands (Hotel Tower 3 B1, Hotel Tower 2 Level 23,Casino B4 Carpark, Hotel Tower 1 Level 15,16&17, Mice Hall E)
Year of Completion: March 2019

Project #9
Work Scope: Replace AHU Motor, Replacement of Actuator And Strainer, Replacement of Actuator, Replace EAF at Link Chamber, Jacketing insulation
Project Location : Marina Bay Sands (Mice Level-5,B1 Female Toilet,Retail Theatre lift lobby B2, Mice B2, Mice Hall A & B)
Year of Completion: March 2019

Project #10
Work Scope: Replace Jacketing, Fix the Metal Ceiling Board, Fix the Fire rated Board And KEF Duct
Project Location : Marina Bay Sands (Retail Mice B1 & B2 ,Hotel Tower 3 B1, Mice Level 4, Retail shop B2-46 & B2-60, Mice Level 4, Casino Level 3 Lion Bridge, ASM-B1 Marketing Office)
Year of Completion: March 2019

Project #11
Work Scope: Dismantle Duct & Ceiling Cassette Unit, Install new Ceiling Cassette Unit
Project Location : NGEE Polytechnic & BalestierSchool, Tai Seng & DSTA
Year of Completion: March 2019

Project #12
Work Scope: Replace Gate Valve, Replacejacketing, Replace 22KW Motor
Project Location : Marina Bay Sands (Hotel Tower 2 Level 9 Room 967, Mice B4 Hx Room Cyclone Pump, Theatre Level 4, Mice Level 3, Theatre AHU-T-4-01, Podium Theatre B3)
Year of Completion: April 2019

Project #13
Work Scope: Jacketing insulation, Replace EAF Duct & FAF Duct Claim 1
Project Location : Balestier Hill Primary School
Year of Completion: May 2019

Project #14
Work Scope: Annual Maintenance FCU Servicing
Project Location : Punjab Grill Restaurant At Marina Bay Sands
Year of Completion:Ongoing – June 2019

Project #15
Work Scope: Repair Works at various part of MBS
Project Location : Marina Bay Sands
Year of Completion:June 2019- August 2019

Project #16
Work Scope: Replace Butterfly valve at PAU at hotel tower 2 level 23
Project Location : Marina Bay Sands
Year of Completion: August 2019

Project #17
Work Scope: Supply & install New FCU and modification of supply duct
Project Location : Singapore Press Holding
Year of Completion: October 2019

Project #18
Work Scope: FCU servicing
Project Location : Alcotec Precision Engineering
Year of Completion: November 2019

Project #19
Work Scope: Jacketing works for FCU -10’nos
Project Location : JTC – Tukang innovation grove
Year of Completion: December 2019

Project #20
Work Scope: PEU/PCU installation works
Project Location : Marina bay sands Tower 3
Year of Completion: December 2019

Project #21
Work Scope: Replace fan motor & fibre glass insulation work
Project Location : Marina baysands Mice B4,Hotel T1 B1
Year of Completion: December 2019 to January 2020

Project #22
Work Scope: Repair Works various part of MBS
Project Location : Marina bay sands
Year of Completion: January 2020 to March 2020

Project #23
Work Scope: Repair Works various part of MBS
Project Location : Marina bay sands
Year of Completion: May 2020 to July 2020(ongoing)

Project #24
Work Scope: Replacement of CHW fan coil unit
Project Location : Assisi Hospice
Year of Completion: May 2020

Project #25
Work Scope:Ducting works & VRV installation works
Project Location : Pub Nbvls
Year of Completion: September 2020

Project #26
Work Scope: MV fan installation and ducting works
Project Location : Marina Bay Sands
Year of Completion:August 2020 to September 2020 (ongoing)